March 21 2024 Construction Updates

March 21 2024 Construction Updates

Mission94 construction update as of March 21, 2024: Plumbing, elevator, building HVAC, building inspections Fire department final walk through Flooring and base Millwork Retail and office furniture Pre-punch and punch list Final cleaning Lower level curved wall panels...
March 14 2024 Construction Updates

March 14 2024 Construction Updates

Mission94 construction update as of March 14, 2024: Sprinkler, solar, fire alarm, exterior/landscaping inspections Fire alarm testing Polish concrete floors Restroom plumbing trim and accessories Flooring and base Millwork Retail Furniture Doors and hardware Dock area...
March 7 2024 Construction Updates

March 7 2024 Construction Updates

Mission94 construction update as of March 7, 2024: Polish concrete floors Restroom plumbing trim, counter tops, and accessories Flooring and base Millwork Doors and hardware Fire alarm testing and inspection Lower level window installation Gun range equipment and...
February 29 2024 Construction Updates

February 29 2024 Construction Updates

Mission94 construction update as of February 29, 2024: Dock lift installation Exterior end piece panel ACT ceiling grid and tile Light fixtures in all areas Polish concrete floors Restroom plumbing trim, counter tops, accessories Stair 1 railings and tile Paint...
February 22 2024 Construction Updates

February 22 2024 Construction Updates

Mission94 construction update as of February 22, 2024: Exterior end piece panel installation Dock lift installation Priming and painting interior ACT ceiling grid and tile both levels Millwork installation Stair 1 railings Circular soffit light fixtures Elevator...