Mission94 construction update as of February 29, 2024:

  • Dock lift installation
  • Exterior end piece panel
  • ACT ceiling grid and tile
  • Light fixtures in all areas
  • Polish concrete floors
  • Restroom plumbing trim, counter tops, accessories
  • Stair 1 railings and tile
  • Paint railings and miscellaneous metals
  • Elevator installation
  • Block and drywall around elevator
  • Lower level doors and hardware