Mission94 construction update as of February 29, 2024:
- Dock lift installation
- Exterior end piece panel
- ACT ceiling grid and tile
- Light fixtures in all areas
- Polish concrete floors
- Restroom plumbing trim, counter tops, accessories
- Stair 1 railings and tile
- Paint railings and miscellaneous metals
- Elevator installation
- Block and drywall around elevator
- Lower level doors and hardware