by Mission94 | Jan 18, 2024 | Construction Updates
Mission94 construction update as of January 18, 2024: Front vestibule doors MEP overhead Drywall hang & tape Stair 1 installation, soffit, & MEP Wall grinding Pull electrical wire MEP trim in gun range Carey’s controls wiring VIEW ALL CONSTRUCTION...
by Mission94 | Jan 11, 2024 | Construction Updates
Mission94 construction update as of January 11, 2024: Retail metal panels Coping Rooftop pavers MEP overhead Drywall both levels Stair 1 soffit Elevator top of shaft and rough electric Scaffold and sprinkler elevator RTU power Gun range equipment cleaning VIEW ALL...
by Mission94 | Jan 2, 2024 | Construction Updates
Mission94 construction update as of January 2, 2024: Retail metal panels Vestibule electric and sheathing Interior framing on first floor MEP installation in wall and overhead Permanent electric installation Elevator electric RTU power Range equipment Landscaping VIEW...
by Mission94 | Dec 28, 2023 | Construction Updates
Mission94 construction update as of December 28, 2023: Solar and lightning protection Retail metal panels Interior framing Fire pump room Sprinkler Switch gear Vestibule power and panel installation Drywall lower level Soffit in retail area VIEW ALL CONSTRUCTION...
by Mission94 | Dec 21, 2023 | Construction Updates
Mission94 construction update as of December 21, 2023: Solar and lightning protection Clearstory storefront windows Retail metal panels Concrete ramp and topping slab Interior framing Retail area HVAC and electrical Sprinkler Fire pump room Gun range equipment Flag...